Skip to Content
author's profile photo Former Member
Former Member

Table link from production order to operations using variant configuration

Hi all,

I'm trying to mine down from the production order down to the operations and work centers assigned.

I'm familiar with the usual method "AUFK-OBJNR to link to AFVC-OBJNR then use AFVC-OBJID to link to CRHD-OBJID"

However the client I'm at uses variant configuration and the Object number in AUFK is different in AFVC. Does anyone know how the data links up when VC is used?

Mark.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 09, 2011 at 03:57 PM

    Ignore question, found the right fields for the lookup.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.