Can anyone help me with one doubt I have with BPM?

When I'm configuring the BPM Task I have to set the Potential Users, also I know it can be set through an expression. However, my doubt is the following,

If I set the potential user in the BPM Task, everytime the task change of responsible user I will have to go to NWDS change the BPM Task Potential User, Build and Deploy again the BPM? That's a lot of work.

Which is the best practive for doing this kind of maintenance?

Regards

SU

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Nov 09, 2011 at 03:53 PM

    you can assign the task to group.

    so you only have to change at UME side, add or remove user to/from the group

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 09, 2011 at 04:33 PM

    the group can be passed in as parameter when triggering the bpm.

    so the group can be dynamic.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.