Hello,

Can anyone help me with one doubt I have with BPM?

When I'm configuring the BPM Task I have to set the Potential Users, also I know it can be set through an expression. However, my doubt is the following,

If I set the potential user in the BPM Task, everytime the task change of responsible user I will have to go to NWDS change the BPM Task Potential User, Build and Deploy again the BPM? That's a lot of work.

Which is the best practive for doing this kind of maintenance?

Regards

SU

Accepted Solutions (1)

Accepted Solutions (1)

junwu
Active Contributor
0 Kudos

you can assign the task to group.

so you only have to change at UME side, add or remove user to/from the group

Answers (1)

Answers (1)

junwu
Active Contributor
0 Kudos

the group can be passed in as parameter when triggering the bpm.