I made a PO with two line items and each has 800 quantity. Then made a partial GR for 400 on line item one and 300 on line item two.
Now I am trying to make the GR for rest of the quantity, but I find something strange. I find overall 5 line items in MIGO. The first line item is for 400 qty and this is correct and the last line item is for 500 which is for second line item in PO is also correct
The rest of the three line item in-between shows 800 qty referring the PO line item 1 I am not sure why and how these three line items are getting included.
Please suggest why this can happen.