Dear all,
In the same period (as per the Planning Calendar: Period lot size), the system has generated PR separately for the Safety Stock and for the PIR after the MRP run. I believe this is happening correctly as per standard SAP.
But is there any way to genearate a single PR for safety stock and the PIR after the MRP run ? Please advice.
Regards,
Brijesh