Hi all,
How to reslove this issue
Long txt
Detail
Diagnosis
In Profitability Analysis, an attempt was made while
valuating with material costing to read for material "<VAR1>"
a standard cost estimate released on posting date "<VAR2>".
The system has discovered that there are no error-free
standard cost estimates released in plant "<VAR3>" on the
specific date "<VAR2>" for material "<VAR1>".
The material cost estimate is accessed according to the CO-PA
Customizing settings for costing key "<VAR4>" under Define
Access to Material Costing.
Display Cost Estimate for Material
Display Material Cost Estimate without Quantity Structure
System response
It is not possible to process the document further.
Procedure
Check your system settings.
Procedure for System Administration
Technical data
Tech. data details
Client
Group Number
Schedule Line Number 0834
Counter in Control Tables 00
Message Identification K/
System Message Number 834
Technical data
Tech. data details
Client
Group Number
Schedule Line Number 0834
Counter in Control Tables 00
Message Identification K/
System Message Number 834
Output Type E
Group Type
Doc. no. Item <VAR1> <VAR2> <VAR3> <VAR4>
0107000330 000000 126238 24.10.2011 8108 Z06
= 1 VF 050 Document <VAR1> saved (no accounting document generated)
Technical data
Tech. data details
Client
Group Number
Schedule Line Number 0050
Counter in Control Tables 00
Message Identification VF
System Message Number 050
Output Type W
Group Type
Doc. no. Item <VAR1> <VAR2> <VAR3> <VAR4>
0107000330 000000 0107000330
with regrds
SAPUSER5