Hi All,
I have a situation where clinet needs to claculate the standard cost every time the routing is chnaged. We wish to chnage the setting in sucha a way that Standard cost needs not be claculated every time in material master once routing chnage is done. Just in cost collector alone the cost rerun needs to done.