Avoid Std. Cost Estimate every time the Routing is changed.

Hi All,

I have a situation where clinet needs to claculate the standard cost every time the routing is chnaged. We wish to chnage the setting in sucha a way that Standard cost needs not be claculated every time in material master once routing chnage is done. Just in cost collector alone the cost rerun needs to done.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2011 at 10:39 AM

    Setting to be done in REM profile. Issue resolved my self.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2011 at 10:39 AM

    I did the setting myself

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.