Dear Expert,
We have business process to create DO with movement type 652, with material status R, for specific purpose.
In IM-WM movement type interface movement type 652(IM) has assigned to mvt type 255(WM).
So i try to to assign 652 to 601 because we need this material will move to issuing area 916, but when we run LT03 the destination area still 255 bin 910 - GI General
i was created new WM movement type 652, and assign to 652, but still have same condition.
So i try to change WM movement type 255 and also change dest bin to be 916 as dynamic bin, but when we run LT03 destination is still 255 bin 910 - GI-General.
Somebody pls help me to solve this problem