Skip to Content
0
Former Member
Oct 21, 2011 at 10:09 AM

Date Seperation in check printing

13 Views

Hi,

I the SAP Scripts , i am having the date variable's value as 21102011.

I want to introduce the logic for the separation of each number by space to print in the check as the check contains 8 boxes respectively.

that is, i want to print the date as 2 1 1 0 2 0 1 1 .

i am not getting the logic as i am new to ABAP.

Please provide me with the logic for separation of Numbers in Date .