Early inspection lot

Former Member
0 Kudos

hi everybody,

Can anyone explain me the uses of early inspection lot, and how to implement it.

regards/rajneesh

Accepted Solutions (0)

Answers (2)

Answers (2)

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear !!!!

Inspection lot for GR from production (lot origin 04)

To create an early inspection lot for a GR from production (lot origin 04) when a production or process order is released, the indicator Control inspection lot creation must be set to Y for the inspection type assigned to inspection lot origin 04 in the material master for the material to be inspected ( Quality management view).

With Regards

Pushpalas

Former Member
0 Kudos

hi surjit,pushpal

Dear both thanks for your replies, surjeet sir i have read these forums already but still not able to understand the complete process. I will be very thankfull if anyone can explain with simple scenerio so that i can understand.

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear

Thanks Listen What i Mean to say u is like u need to Clear Of the Early inspection Stock u can Do this BY changing the Inspection Dates Also You make a usage decision with an acceptance and post all open stocks.

See Like Suppose Ex: U got Raw Material into The Shop Floor At one today Suppose But u need to Make Quality Clear For Today Date u need to Change the Date In Inspection Lot And Execute So that early Inspection Carries on

With Regards

Pushpalas