Skip to Content
author's profile photo Former Member
Former Member

SAP HCM in ECC 6.0

Hello Gurus,

We are having 4.7 system where HR,Finance is running.Our Client needs the functionlity of ECC 6.0 for HCM module.Currently there are interested to implement ECC where they will be using only HR module & the finace will be there in the existing 4.7 system.Will it be possible to use SAP HCM in ECC with Finance in 4.7 system??If it works how to do that?Is it through SAP PI?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 20, 2011 at 11:15 AM

    Hi,

    The best solution would have been to upgrade the 4.7 system to ECC6 and to use Finance and HCM in the same system.

    R/3 4.7 will soon be obsolete... So the ECC6 upgrade will anyway be needed soon.

    If you absolutely need 2 systems , yes you can connect ECC6 HCM to R/3 4.7 through ALE/idocs. It is especially needed if you will do the payroll on the HCM system.

    Regards,

    Olivier

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.