on 10-20-2011 9:21 AM
Hi Experts,
We have one issue, we are having company code currency in OX02 as CNY and we want to chagne this currency to INR. But the issue is system is not allowing to change this settings. There are around 10-20 entries posted for CNY Co Code. I am getting the below error message.
We are facing this problem in Develpment Server. I mean the changes have still not moved to Quality.
(You may not change the currency since documents exist with this currency Message no. FC064).
Is there any way out where in we can change this settings ???
Regards.
Hi,
Still settings not moved to Quality not an issue.
1 - Remove Productive Check Box from (OBY6)
2 - Execute T.Code: OBR1 rest transactions data.
3 - Change currency.
Regards,
Viswa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Viswa,
You are great sir....i have sucessfully executed the same in sandbox and now in develpment system. Thank you so much for it. One more question i have also created Company also which has the same currency as its for co code shall i change it to new currency ???
And as i told you that our configuraiotn is still in Develpment, when the co code moves to quality shall we agin have to follow the 3 steps mentioned by you ??
I have assigned u points. Thank you once again
I think its not answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi:
Changing company code currency is a complicated process, especially with open items. Please have a look at OSS note 39919.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Atif but the solution provided by Vishwa is working really fine without any issues.
Do you mean to say the solution proivded is not good option ??
I am little afraid now......
Also vishwa the cost center which were already there before doing obr1 there is still the old currency. I mean when i changed the co code currency manually to new one then the old cost center currency is not getting changed ???
Pls advice me
Hi Gabriel Borde,
It is not a serious effect to your system, why? Still your company code is not in even Quality system.
Dear Atif, plz go through requirement, he is not @ moved this settings even quality system, once company code on live then it is very difficult to change currency. This case not an issue to change currency.
Delete existing Cost centers / Block Cost Center. I am verymuch confident about this solution, it will work properly without effect any process.
regards,
Viswa
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.