Dear SAP gurus,

I have independent requirements for material A from week 40 2011 up to week 39 of 2012. in both md04 and ms04, planned orders were generated, however upon checking the dependent requirements for roh and pack, the system summed up the requirements in one month (October 2011), thus only one planned order was created.

Upon checking the material master, it has procurement type F and MRP type PD and period indicator M. is there something wrong with this? Should i change the period indicator since uploaded PIR is weekly?