Hello SDN,
I am scheduling a production order, but instead of scheduling the job at the beginning of the shift, it is scheduled at the end. Is there a setting in config where I can set production orders to be scheduled as soon as possible, as opposed to finishing at the end of the shift?
Thanks,
Andrew