on 10-14-2011 12:43 PM
Hello All.
User states.
"Always the user who is trying to do a RTV gets locked out after confirming the TO and going back to VL02N to post goods issue SAP always locks out the user, sometimes for a very long time".
For me it's clear thta another or same uer is locking the Outbound delivery.
Could be this causing by a low response SAP inside or error message is totally clear?
Hi sir
Check Define checking Groups OVZ2
SPRO > Sales and Distribution > Basic Functions > Availability Check and Transfer Requirements > Availability Check > Availability Check with ATP Logic or Against Planning > Define Checking Group
Check your Block qty requirement. This is to allow several users to process same material simultaneously. Otherwise the problem si your connection.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
done
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.