CEWB

Former Member
0 Kudos

Hi,

Can any one explain me about the transaction code CEWB and its functionality of executing the transaction.

What are all the uses that can be obtained from this transaction.

And in specific i need to know how to make an change to the storage location, which is available in the BOM using this transaction

Regards,

Deepak GS

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Deepak,

This T.Code CEWB can be used for mass change of field values related to BOM header or BOM item level or for the operations

in the routing.You can see the multiple line items say for Eg,all the BOM components for a list of material BOM and you can make

necessary changes in the same.

The work list which is an input for this transaction can be configured in T.Code OP77,also use search option to get more info in

this forum.

Regards

Mangalraj.S

Former Member
0 Kudos

Fine.Thanks for the reply, Mangalraj

My requirement is that i need to change the storage location in the BOM master for the group of materials how to do this in the mass changes.Without LSMW.

Regards,

Deepak GS

former_member184655
Active Contributor
0 Kudos

Dear Deepak,

check this link,

Regards

Mangalraj.S

Former Member
0 Kudos

Dear Deepak,

As far as I know, Storage Location for BOM on Production Order is maintain on MRP View 2 (MM01/MM02)

If you want to do mass change for storage location, you can use Tcode MM17 as follows:

- Choose "Plant Data for Material" (MARC) then 'Execute'

- entry plant and/or material then 'Execute'

- on the top left, click 'Select Field' then select "Storage loc. for EP" (and "Prod. stor. location" also, if you want)

- entry new storage location on the "new values" record

- click 'Carry Out a Mass Change' to do mass change

- or you can change 1 by 1 on the list record

wish you luck..

Best Regards,

Ratri

Former Member
0 Kudos

Hi,

The answer for the material master and not for the BOM

Regards,

Deepak GS

Answers (1)

Answers (1)

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear !!!!

This T code CEWB is used in Engineering work bench,where no need of maintaining separate BOM & routing.

Please check this link

[http://help.sap.com/saphelp_470/helpdata/en/79/517c3545413671e10000009b38f889/frameset.htm]

Where else Using CS20,mass changes to a material,document & class can be carried out.

with Regards

Pushpalas

Former Member
0 Kudos

Fine thank you

I have checked the CS20 but in the header of the material in the staus tab ow to change the storage location filed?

Regards,

Deepak GS