on 10-09-2011 4:23 PM
Experts:
Now I have a problem,
I need to add a new period in Contract(ME33K),
I already have a period item in contract like 01/01/2011~12/31/9999, 100,100.
I need to use LSMW,
1.change the period to 01/01/2011~01/01/2012,100,100
2.add a new period :01/02/2012~12/31/9999,100,105
I can do the first step beacuse there has value in table A016/KONP,but I can't do the second step,the field KNUMH is autocreated by system? I use BUS2014/PURCONTRACT_CHANGE
Please help!
Hi MF ,
i think you have to find relevant fields for valid_from and Valid_to , im referring structure ITEM_COND_VALIDITY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for reply,
I have used these strcture for update,
E1BPMEOUTVALIDITY
E1BPMEOUTVALIDITYX
E1BPMEOUTCONDITION
E1BPMEOUTCONDITIONX
But there is a field SERIAL_ID I don't know what value I should put in.
Is it possible to use any function to create a serial_id? I konw it should be unique.
If I put space in,it doesn't work
Edited by: MF Z on Oct 12, 2011 4:50 AM