ERP 6.0 EHP installation - The stack does not match the system

Dear All,

I'm updating ERP 6.0 using EHPi. Stack.xml was generated by solman, but during phase: PREPARE_JSPM_QUEUE it throws:

The validation of the deploy queue was not successful. 
Validation of queue sapjup-queue completed with error The stack does not match the system. 
Probably the system was changed after the stack was generated. Synchronize the system 
with SAP Solution Manager and then generate a new stack. 
Product EHP4 FOR SAP ERP 6.0_NW701 with ID 01200615320900003195 is found in the system
 but not in the list of expected system products in the stack. Software component 
sap.com/WDEXTENSIONS is found on the system but not in the list of expected system 
components in the stack. Software component sap.com/JLAUNCH is not found on the 
system but is present in the list of expected system components in the stack. There are 42 
more error messages. 
See them all in C:\usr\sap\ER1\DVEBMGS02\j2ee\JSPM\log\log_2011_10_07_17_04_55. JSPM 
version is 7.02.8.0.3. Current JSPM log directory is 
C:\usr\sap\ER1\DVEBMGS02\j2ee\JSPM\log\log_2011_10_07_17_04_55. 
The following SAP Note 1399846 may contain solution for the problem.

so I guess I broke something in SMSY... My configuration is double stack on Oracle 10.2.0.4 Windows 2008 x64.

In SMSY Landscape components:

SAP ERP
 |__SID
      |___SAP ECC Server
      |___SAP NW Application Server Java

SAP NW Application Server Java has assigned technical system type 'Java'.

In Header Data in product versions is see only: 'SAP ERP 6.0'.

What's wrong???

Thanks in advance.

Edited by: pw.skiba on Oct 7, 2011 5:27 PM

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

5 Answers

  • avatar image
    Former Member
    Oct 07, 2011 at 03:30 PM

    Hi,

    Please check logs in detail which packages are missing. Please paste the log here for this phase.

    It looks like stack xml is not correct.

    Thanks

    Sunny

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      As per the above log files your ERP system not maintained properly in solution manager.

      Before generating the stack file you have to make sure your ABAP/JAVA systems should maintain properly in solution manager.

      Solution manager gets the java system information through SLD system.You have to make sure that your java system is maintained in your central SLD or not.

      If not maintain the same in SLD.After maintaining the system in solution manager you are suppose to see ABAP/JAVA components in your solution manager.

      After the stack file generation please check the files and make sure all files are downloaded properly.

      Regards,

      Kiran .V

  • Oct 07, 2011 at 03:32 PM

    Hello,

    Software component sap.com/JLAUNCH is not found on the system but is

    present in the list of expected system components in the stack.

    Please check this again and generate the right xml stack for your system

    by syncronizing the solution manager in accordance to your source system

    with the software components maintained with their correct

    patch level.

    regards,

    John Feely

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 11, 2011 at 11:37 AM

    ABAP instance was properly maintained in SMSY, but technical system for Java instance didn't want to obtain data from my system. I've manually choose components versions for Java stack and generated new stack.xml in MOPZ. Installation went ahead. Thanks for help.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi

      even i am facing the same issue...

      my Solman abap systems maintained properly in smsy but not solman java..

      i am also getting the same issue while upgrading to 7.1, could you please help me how to download required files manually using MOPZ.

  • avatar image
    Former Member
    Dec 21, 2011 at 05:45 PM

    We hava also similar issue during EHP5? Does any one has fixed? Though we have configured through SMSY and java entries through manual, But ABAP stack check phase (ROAD MAP) has completed successfully but we are facing @JAVA stack if any one faced similar issue?

    Raj

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 25, 2011 at 03:19 PM

    Issue has been fixed.

    JAVA software features are recorded at BC_SL_SWFEATURE table (JAVA DB schema SAP<SID>DB) and JAVA sections of stack XML files. JSPM tries to match software features on the system with this BC_SL_SWFEATURE table. so software features described at target-system tags into SOLMANstack.xml in order to validate the stack.

    These entries can be removed. To fix this you have to verify the above table, which is with java schema name. Before applying

    any modifications to BC_SL_SWFEATURE please make full backup of the table.

    select * .... SAP<SID>DB.BC_SL_SWFEATURE; Take a backup of the table and delete the entries. Re-create the stack.xml file and run the roadmap.

    Hope this will help...!!