Hi,

I have a requirement where I want to calculate the Total Production Time for the FERT material such that it adds the operations time from FERT routing and adds the operations time from its HALB and gives the Final result telling us that to Produce FERT it will take X minutes.

Can anyone tell me if there is a report for that?