Automatically change material cost in all plants

16 Views

Hello,

Our group is made up of multiple production companies and 1 distribution company. The distribution company is made up of multiple plants.

All stock in the distribution company is replenished from the productions companies through plant A only, The stock is then transferred via MIGO to the other distribution plants. Sometimes when we try to transfer stock from plant A to B we receive the error "Account xxxxx requires an assignment to CO object". To correct this error we have to change the material cost in plant B to the same cost as plant A using transaction MR21.

Is there any way to automatically assign the material cost in Plant A to the material cost in plant B?