Skip to Content

Usage Decision : Mov 102

Hello.

When i do an usage decision in inspection lot, can i do movement 102 to return goods. ?

I have a problem: when i receive goods from vendor, and i do migo to enter goods.. In QM will generate inspection lot.

But after, the employes review goods, and sometimes some handle units are wrong, and we have to reject this HU.

Is it possible to do mov. 102 in usage decision?

How can i do this, without affect statistics in QM.

Regards.

Antonio

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Sep 30, 2011 at 11:30 AM

    Hi,

    You can do 102 i.e. GR cancellation till the Inspection lots has not been processed by QM inspector.

    If this has been done and stock has been posted to unrestricted stock. You can not take it back to Quality Stock as standard SAP.

    You need to apply a OSS note for the same. There are many such posting for this scenario.

    To cancel the Inspection lot and GR posting after results recording

    Also if you want to go standard way, Just visit SAP help

    http://help.sap.com/saphelp_47x200/helpdata/en/af/b9b3341a933f50e10000009b38f83b/frameset.htm

    Inspection Lot Completion ---> Stock Postings -


    > Stock posting reversals.

    Nitin

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.