Skip to Content
0
Former Member
Sep 29, 2011 at 04:14 PM

how to check CVC lock/unlock status

73 Views

Hi Experts,

In DP when user switches between two CVCs an ADF process is launched.

before launching on this ADF process I need to check if the previous CVC has been unlocked by the planning book.

if not I need to wait until it is unlocked before launching ADF process.

in order to make this wait dynamic I need to check the lock/unlock status of that CVC.

is there any table where I can do the same or do we have any FM to check the status?

Thanks in Advance for your help

Omkar