Skip to Content
0
Former Member
Sep 28, 2011 at 07:47 AM

Quota management

19 Views

Hi Guys:

I am using quota management to allocate purchse qty for two vendors, and I also use maximum lot size. let's say two vendor A,B.(A quota 70%, B quota 30%), for vendor A maximum lot size 600pc, vendor B maximum lot size 384PC. and now there a requirement have 3150pc in MD61, Run MRP, in MD04 there are 3 PR with 600pc and 3 PR with 384pc, but so PRs needs to be convert to PO and GR, I'd like to know is there any way to combine this PRs?