Sales Order does not show up at the resource level.

26 Views

Hi guys,

I have a flour mill of having 4 processs (resources)

1). Tempering (cleaning).

2). Milling.

3). Blending.

4). Packing.

I have two identical sales order. One has been through all the process (resources) and showed in the DS Planning board but, other one has not shown up there. It happens to me couple of times that such sales order do not show up at the resource level. Where should I check and correct? Aslo which way can I follow up these missing sales order? and What shoud I do if this situation happens?

Thanks

Shaan.