Inconsistency values between reports S_ALR_87100185 and CJI3

Hi experts,

We are having inconsistency values between reports S_ALR_87100185 ​​and CJIE.

I read the message posted in actual-cost-value-in-report-cji3--salr87100185-rep, but not solved our problem.

In fact, all reports made ​​to show different values ​​when analyzed in CJI3 (eg S_ALR_87100188).

This may be related with the database currency (currency translation) that is used in the report ?

Regards,

Alessandra

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 26, 2011 at 03:38 PM

    Hi,

    There are many other posts as well in this regard and if you search once more you should able to find them. Some of the possibilities that you can check are the value category set up and see if any cost elements are missed out, run CJEN to clear any inconsistancies, check the report profiles / layout / filters etc.

    Regards

    Sreekanth

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 27, 2011 at 06:00 AM

    first run CJEN and see any value category miss match is there or not. While running system will show you the warning message if any Cost element is missing from value category.

    Please also run some cost element report and verify, if you do not want to include value from some of the cost elements in the report create a suppress value category and suppress them.

    You can also filter CJI3 report by excluding all the business transactions those are related to settlements (settlement to AUC / settlement to superior WBSE / settlement reversal etc..etc..)

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 28, 2011 at 05:26 PM

    Hi,

    I ran the CJEN but the project is ok. In fact all projects are showing differences in S_ALR_87100185 vs CJIE.I think the problem is in reports S_ALR_...... because de CJIE displays the correct values.

    I´m thinking of create a new report (using S_ALR_87100185 as a model) and change de database currency to BRL. It´s possible to do this ? The user ask me to include the period in the report filter too.

    Regards.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      You can develop reports similar to S_ALR_87100185, if that's what is needed. You will have two options. One to write a ABAP report that full fils your reuirements and the second would be to develop a report painter report (using CJE1 / CJE4). In the report painter you have the option of selecting the currency like controlling area, object currency etc.

      On a separate note I would also suggest to check the exchange rate settings once, since you mentioned that all projects are showing difference in S_ALR_87100185 report.

      Regards

      Sreekanth

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.