SAP Patch level accross multiple interconnect systems

Former Member
0 Kudos

Hi

I have the following SAP systems that are interconnected: ECC6, BW7, xRPM 4.5 and Enterprise Portal 7(all on the same SPS).

I would like to know can I increase the patch level of BW to a higher SPS without affecting the inter communication between the systems?

Thank you

Duvan

Accepted Solutions (0)

Answers (1)

Answers (1)

sunny_pahuja2
Active Contributor
0 Kudos

Hi,

You can upgrade your BW system. I don't see any risk here but you first do it on your quality system and see if everything works fine then you can do it on your production system.

Thanks

Sunny