Skip to Content
author's profile photo Former Member
Former Member

Bin Configuration..

Hi all,

How to Configure Lineside bins for staging production materials which are SU managed. and will determine what u201Clotsu201D of materials are being consumed by production based on FIFO.

Thanks

Balu

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 26, 2011 at 01:48 AM

    Hi,

    Create a storage type as 100 for for staging materials and create line side bins in this storage type. Please activate the SUM in storage type. Use Staging Indicator 3 (Release Order Parts). Hope it helps. Thanks.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.