Hello everybody
I have got a problem with the integration of ORDRSP Idocs in MM (ECC6 - SAP_APPL 604) in the case of a PO rejection in SNC (7-SP7).
When rejecting a PO from SNC, the ORDRSP idoc is not integrated in MM
and is marked with an error message refering to a quantity difference
between the Idoc and the PO : "Acknowledgment for PO item 7621019091
00010 contains quantity variance"
Associated to the ORDRSP Idocs we are using the process code ORDR, and
I have checked that if we use the ORDR_SUS process, the integration
works well and the items are rejected in MM !
But I haven't found much informations about the differences between
ORDR and ORDR_SUS.
Is there a way to make the PO rejection works with the ORDR process or
could you tell me about the side effects of using ORDR_SUS in place of
ORDR ?
Vincent