on 09-23-2011 4:20 AM
Hi gurus,
In our project, we have a lot of ECC clients. So in PI system, we need to do a lot of same work in one scenario(Although we have config wizard,it's still boring because of our slow network speed).
Do we have any fast method to fix that? I mean can we edit the xml of one scenario and then import it into ID?
There is an import function but only we can import tpz files.
Thanks in advance. Any help will be appreciated.
Not possible As per my knowledge
Regards
XA