Hi Guys,
I am connecting SAP-GIS using Sbi4 integrator.in SM59 for TCP/IP connection I gave
RFC Destination : SBI_JCO_SERVER
Connection type : TCP/IP
Program :SBI_JCO_SERVER
Target host : where my SBI server installed.
while testing RFC Destination it is giving error:
<b>Connection error :timeout during allocate/ CPI-C error CM_RESOURCE_FAILURE_RETRY</b>
any setting i need to do in SM59 or some where..
any help..
Thanks
Rajagopal
Hi Rajagopal,
Have a look at OSS Note 34219. Hope this note gives some inputs.
Thanks
Lakshman
Add a comment