how to roll back changes made by other user in nwdi?

hi all

my doubt is.

if there are errors in the WD NWDI project (cause developer before me had deleted/ added some of the code which is causing those errors).

how to roll back the code changes which were made by other user.

i think through sync option but when we sync to a earlier date we cant check out the code to make changes.

help me.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Sep 15, 2011 at 03:13 PM

    Hi Madhu,

    Follow the below steps:

    1.Sync your code to earlier date and time till it was working perfectly.

    2. Go to navigator and copy src folder of your DC and save it in your hard disk (e.g. desktop)

    3. As in older code you are not suppose to check out so Sync your latest code from NWDI

    4. copy all the three folders of your src folder(configuration,packages,mimes) which you have saved in your hard disk.

    5. Again Go to Navigator and right click on src folder of your DC and paste all three copied folders into it. It will ask for new activity to create.

    6. check in and Deploy that activity and you are done.

    I hope it helps.

    Regards,

    Rohit

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Rohit Makkar

      thanks madhu.

      ur reply solved my problem.

      for others.

      Follow the below steps to solve the problem:

      1.Sync your code to earlier date and time till it was working perfectly.

      2. Go to navigator and copy src folder of your DC and save it in your hard disk (e.g. desktop)

      3. As in older code you are not suppose to check out so Sync your latest code from NWDI

      4. copy all the three folders of your src folder(configuration,packages,mimes) which you have saved in your hard disk.

      5. Again Go to Navigator and right click on src folder of your DC and paste all three copied folders into it. It will ask for new activity to create.

      6. check in and Deploy that activity and you are done.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.