Skip to Content
author's profile photo Former Member
Former Member

Effort estimation for PI 7.11 --> PI 7.3

Hello!

We are using PI 7.11 (SPS 6) and would like to update our system to PI 7.3 current SPS.

What is approximately the effort for the technical update

(more thab 5 man day)?

Thank you very much!

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Sep 14, 2011 at 09:33 AM

    there is no standard template available for your query.

    Assuming that you have to create medium complexity scenarios from start (Message mappings using standard functions, UDFs, IDOC, RFC, FCC etc) then 5 working days should be enough for development, testing and documentation.

    However if you have have ccBPM then the effort may increase (especially if you have single stack installation of PI7.3 as ccBPM needs to be developedin Netweaver BPM tool).

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.