Hello Expert,

We are getting the message "Data partly after horizon 01.09.2016 to 01.12.2017" while we load a material in planning book and run the heuristic below popup is appearing:

2- We have one Planned Order (fixed) for material XYZ01234 in plant S124 that is display in Planning Book in the line Production Planned instead of Production Confirmed :


We have run all the consitency check and STB and TBP are also fine.

please advise on the same.

Thanks,

Accepted Solutions (1)

Accepted Solutions (1)

Hi Jeet,

This can happen if the heuristic has created a receipt outside the horizon / date range which the Planning Area has been initialized with. In this case, the element created after the horizon will not be saved. If necessary, the Planning Area can be reinitialized with extended horizon.

Regards,
Tiago

former_member332160
Participant
0 Kudos

Hello Tiago,

Thanks for looking into this issue.

We have Time bucket profile for 52 week. so how we will know that element are getting created out side this horizon?

Thanks,

Jeet

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Jeet,

As Tiago mentioned do check the planning area initialisation horizon as well as storage bucket horizon for the concerned planning area via /SAPAPO/TR32.

Thanks & Regards,