Transporation cost

Hi ,

We have a central store which is been created as Plant in our SAP JP01

We have project Sites across different Sites which are created as storage location under this central plant JP01.

so when we have to move stock between these plants , we post 309 movemnt. but since distance between these Storage locations is considerable, is there any way to capture transportation cost involved?

or we have to create seperate plant?

Thanks

Manoj

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Sep 08, 2011 at 06:43 PM

    http://www.architectsap.com/blog/sap/how-to-setup-stock-transport-order-between-two-storage-locations/

    I found this good link in case you want the confirmation for the solution.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 08, 2011 at 06:41 PM

    Hi ,

    We have a central store which is been created as Plant in our SAP JP01

    We have project Sites across different Sites which are created as storage location under this central plant JP01.

    so when we have to move stock between these plants , we post 309 movemnt. but since distance between these Storage locations is considerable, is there any way to capture transportation cost involved?

    or we have to create seperate plant?

    Thanks

    Manoj

    Hi Manoj no need to create the separate plant. please check that the stock transport order between storage locations option:

    the node is as follows:

    SPRO - > Materials Management - Purchasing -> Purchase Order -> Set up Stock Transport Order -> Set Up Stock Transfer Between Storage Locations

    The functionality is by default not activated in the SAP. Once it is activated the Stock transport between the storage location can be done with the freight cost.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.