Production Order Variance Settlement to COPA

0 Kudos

Hi All,

I am trying to settle Production order Variances to COPA - but the Variances are not getting settled.

What Configuration/steps I am doing:-

1) In the Settlement Profile I have checked "Variances to Costing-based PA".

2) Maintained a PA Transfer Structure and assigned Combination of Cost Elements and Variance Catogories to Value fields. These cost Elements are same through which the Production order is debited (Includes both Primary and Secondary Cost Elements). This PA Transfer Struture is assigned to Settlement Profile mentioned in step 1.

3) on the Production order we are issuing actual labour hours which is causing Variances.

4) Calculate the Variances on the Production Order using Tcode - KKS2.

5) Settle the Production order - At this step a Accouting Document is generated and Variance is posted in FI using the the PRD Account. But no COPA Document is been generated?

I am not using any Allocation Structure in this process and believe that is correct.

Not able to understand what I am missing.

Ankur

Accepted Solutions (0)

Answers (2)

Answers (2)

waman_shirwaicar
Active Contributor
0 Kudos

Hi,

Please review the note 35507 regarding the variances settlement in COPA.

regards

Waman

ajaycwa1981
Active Contributor
0 Kudos

Hi Ankur

I faced the same situation 2 yrs back and the reason was KKS2 was not executed in Update mode...

i.e. If you execute KKS2 in test mode followed by KO88 or CO88 - It would generate an FI Doc.. But COPA doc wont be generated

Please reverse the settlement and try as mentioned above... Still if it does not generate, you need to see the possibility of exit in Place (COPA0005)

br, Ajay M

0 Kudos

Hi Ajay,

I have checked and tried again running KKS2 in Update mode - but same result. No COPA Document generated.

I have also checked for exit COPA0005 and we are not using it.

Also want to add that the PRD account assigned in OBYC is not a Cost Element.

And when I am settling the order system is showing following two receivers:-

1) Material #

2) Profitability Segment.

But still no COPA document is been generated.

Ankur

ajaycwa1981
Active Contributor
0 Kudos

Hi

PRD-PRF is never a cost ele

Check KE24 and see for record type C,.. If its still not there, raise an OSS msg to SAP

br, Ajay M

Former Member
0 Kudos

Hi,

If i don't create cost element for account of PRD operation, when i check the flows between FI -> CO (T-Code: KEAT; KEAI), I find a delta for the values of the settlements.

Is it correct ? How can i solve it ?