Skip to Content

Deployment: excess stock

Hi Experts,

We have a deployment process, were one Source location is deploying to 1 destination location. The destination location sends its demand to source location through Pur. Req.

Currently we are using Distribution rule "X- Push by Demand", fair share rule "blank" and Push Depl. Hor = 999. Whenever demand is more than supply, deployment is distributing the supply.

Now the requirement is: when there is EXCESS stock at source location that excess stock should also be COMPLETELY DISTRIBUTED.

I do not wish to change my safety stock at destination plant and are using the deployment heuristic, the Deployment horizon = 999.

Please let me know, how can I map the above new requirement.

Thanks & Regards

Andrew

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 08, 2011 at 09:20 AM

    Hi Andrew

    Did you tried using the ditribution rule Q- Push by quota arrangment ? You would need to maintain an outbound quota arrangament of 100 % at the source location. I belive this should deploy the excess stock.

    Regards

    Deven

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.