on 09-08-2011 8:58 AM
Hi
Can someone explain the settings for this parameter? I could not figure out what should be the prefared setting?
Thanks
Hi,
This setting makes the decision on keeping the changes made in ECC and APO systems on the same time. For example, someone makes change in a particular planned order in ECC while someone else is changing the same order in APO. while saving, how the planned order should be updated, whether with the ECC changes or APO changes in both the systems is decided by this setting.
Preferred setting is based on your requirement. However most of the systems, I find it set as 2 - Use Update Logic, Automatic Retransfer. This confirms that ECC changes have the highest priority over APO changes.
Please refer the F1 help on that field.
Regards,
Manimaran M.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.