Integration between PM and PS

We have integration between PM and PS and we need to capture the cost incurred in PM order and for that WBS has been assigned in PM order and budgeting has been done in CJ20N and the cost is not reflected in project at

Edited by: SUDHAKAR P V on Sep 7, 2011 3:49 PM