Hi,

I have created a LTP senairo and took the LTP Run through MS01. The planned order were created for the materials but the dependent requirements were not planned. In MS04 against the planned order I have an exception message 52 (No BOM selected) What can be a cause for this are there any specific settings to plan dependent materials through LTP? My requirement is that LTP should also show dependent requirements for the components.

Thanks!

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In the planning scenario you can choose a different BOM selection ID for the LTP run. This way you can use specific BOM usages per LTP or MRP. You may have maintained BOM selection ID in the planning scenario and ordinary BOM usages could not be selected. Otherwise there are no other settings for LTP.

Regards.

Former Member
0 Kudos

Hi Özgen,

Thanks for the reply. I had entered the BOM selection ID but still it was not planning it. The problem was with the dates and when I pulled it in the planning Horizan it did plan it.. Even if there is not BOM selection ID maintained it will plan the dependent components which its doing in my case. Thanks for the reply though!

God Bless!