Inspection Skip based on Qty received and duration from supplier

Hi all,

1. Is possible to skip inspection based on Qty, we would like to skip the inspection after receving 10000 qty from supplier

2. Is possible to skip inspection based on duration, we would like to skip the inspection after one year starting from date of first goods receipt

Please provide your valuable suggestions

Thanks & regards,

rajesh

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Sep 06, 2011 at 04:32 PM

    No.

    And No.

    Sorry. not with standard SAP.

    FF

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.