BOMMAT should not be send when highest level material flagged for deletion.

We are working with SAP ECC6.

When a material of a BOM (highest level material) is flagged for deletion it is still possible to change the BOM. Via change pointers and automatic setup, the BOMMAT IDOC is created and send.

We don't want to send the BOMMAT automatically when the highest level material is flagged for deletion (in the MARA or MARC table, field LVORM).

We are working with the SAP standard to send the BOMMAT.

Anyone any idea how to handle this? (enhancement, user-exit, not possible in standard SAP, ....)

Thanks, Ann Michiels.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2011 at 09:23 AM

    The use transaction BD30 to send BOMMAT sometimes for all BOM's. Also when materials are having a deletion flag, the BOM's are send. How can we avoid this? Thanks.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.