on 09-02-2011 2:48 PM
sub contractor stock is not considered
we have plant stock is 41
subcontractor stock is 89
total we have 130 in stock
safety stock is 100
our requirement is 37
so planed order(Pr order) should be create for 7 nos
i want to include the subcontractor storage location stock
po or sub requirement need for 7 nos
Check settings in Availability check control (OPJJ) based on the availability check you use in the material master with checking rule PP. The "W/o subcontracting" should be unmarked.
Regards,
Roopesh