Skip to Content

How to convert Warning message CK758 to Information message.

Hi,

While executing sales order cost estimte, I am getting following message as "warning" but want to convert it to "Information". Can you plz suggest where to do this change. T-code OBA5 is not helping.

Message:

Valuation in costing variant is not the same as operational valuation

Message no. CK758

Diagnosis

The costing variant KPC2 chosen has a different valuation to the operational valuation in plant FI05.

Regards,

Bijay

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jun 13, 2012 at 12:51 PM

    Hi Bijay,

    Message CK758 cannot be switched off via OPR4_CK, that's the standard system.

    As a suggestion, you may change the code of MODULE (PAI) CHECK_VALUATION_I0C. Of course this would be a modification.

    Regards,

    Raghu Ram Thatavarthy

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 30, 2011 at 10:31 AM

    Hi,

    I see that this message as a standard message in transaction SE91. I suppose, we can check with Basis team on this.

    Kiind Regards

    Umapathi G

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.