Change schedule of Manufacturing orders in ECC X order status

Dear SAP gurus,

We are working with ECC integrated with SAP APO. In some cases we cannot change the order dates (schedule of orders) in the ECC system, we can only change this schedule in the connected APO. We have observed 2 situations where we cannot change order schedule on the SAP APO side:

1. Order with Status CRTD (Created), EXTS (Changed by external system) and EXPL (External Conv.of Planned Order)

2. Order with Status EXPL (External Conv.of Planned Order) and REL (Released)

The status mentioned on 1st example correspond to the status of converted planned order in the SAP APO system. The status mentioned on the 2nd example correpsond to the status of an order created by another system and sent to APO for scheduling. If we undo the release of the order on the 2nd example (chaing to status CRTD) we can change the order dates on the ECC system.

How can we control this configuration? Maybe would be interesting to have the option to schedule orders on APO and ECC as well.

Thanks and BR

Mauricio

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Aug 31, 2011 at 12:44 PM

    There is a workaround that you can use to be able to change the Production Order on ECC side: make changes that require a date change like reread master data or changing the order quantity.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 01, 2012 at 09:17 PM

    Hi Mauricio,

    We are facing with the same situation.

    Have you found an "elegant" solution for this issue?

    Best Regards,

    Dario

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 13, 2012 at 11:53 PM

    Hi Dario and Maurício!

    The EXTS will be set at header level and the DSEX status will be set at the operation level if the Material is being planned externally. This indicates that this order is being scheduled by the APO system.

    If you want to avoid this from happening, you could disable the Distribution definition at /SAPAPO/CP1 and set the Publication Settings to "No retransfer" for "In-House Production" in /SAPAPO/CP3.

    But bear in mind that this can cause inconsistencies of dates between both systems.

    In summary: the SCM is the leading scheduling system and no changes in ECC should occur for these orders.

    The most "elegant" solution would be to trigger a "Read PP Master Data" and re-explode the order in ECC.

    Step 1:

    Step 2:

    For more information, please refer to this note:

    423626 - Different dates in R/3 and APO

    Best regards,

    Will


    Screenshot992.png (61.4 kB)
    Screenshot993.png (30.9 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 02, 2014 at 12:15 PM

    Hi !

    Has anyone faced a scenario where order is with status CRTD and EXTS set in ECC by APO but at the same time scheduling is not happening in APO, infact PPDS is not configured ?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.