cancel
Showing results for 
Search instead for 
Did you mean: 

SNC Transportation Lanes validity

Former Member
0 Kudos

Hello everybody,

I recently upgraded my SNC 7.0 from SP5 to SP7 and now have a problem with the transportation lanes validity dates.

All the transportation lanes created by CIF replication contain lines of article with an End Date at the 31.12.2010.

So I cannot anymore send PO from my R/3 system because they are all rejected with the "Lane not found" message in SNC.

So I am wondering where those validity dates are customized. I don't even know if it is a data imported from R/3 or if it has to be defined in SNC ?

I found those dates in the table /SAPAPO/TRPROD but cannot edit them.

Need quick help because all my Xxml messages are actualy dumping.

Thx.

Vincent

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thx a lot Nikhil.

Do you also know a way to disable the validity period control ? (but without disabling the Lane's existence control)

I only know the PO_LANE_MISSING validation check which is too general.

Vincent

Former Member
0 Kudos

Hi Vincent,

You can change validity date of the contract in SNC (Which will change validity of the transportation lane in SNC).

Go to transaction code:/n/SAPAPO/MTI2 and enter below details;

Log.Source Sys=<ECCLogicalName>(Press F4 for name)

Source Category=2(for contract).

Click on Read Sources.

Then click on change button to change validity date of the contract.

But it is better you change validity from R\3 side and CIF it to SNC.

Regards,

Nikhil