Skip to Content
author's profile photo Former Member
Former Member

Kanban - Control cycle

Hello all!

I am trying to create a control cycle for Kanban in my test system. I have created replenishment strategy in Customizing for Kanban and this was transferred all to my test system. When I want to input the address for a vendor it says: Replenishment strategy in plant ... does not exist.

I suppose there must be a problem with my Replenishment strategy which I have created in Customizing for Kanban. I was not sure about what I need to specify. I have specified plant, type of Procurement:it is an external Procurement, working with Scheduling agreements, Order type - LP, GR - 101, Signal lock- 0. These are all information, which I have specified I was not sure about the rest.

Please could anyone help me ??

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 26, 2011 at 03:45 AM

    Hi,

    I answered to few of the threads, hope it will help you, if required any further info please let us know.

    implementing-kanban-wm

    creation-of-control-cycles-for-lean-wh

    thanks

    Om

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.