Dear SAP GURU,

we have a requirement which has been elaborated below

ME21N:- (45-1)

We have creates PO, the details are

MMR : - COPPER

QTY : - 100 KG

Unit Price : - Rs. 10 /-

Total price : - Rs. 1000/ -

FRC1 (Fright /Quantity) :- Rs.5 /- per unit. (Hence for 100 kg it will become Rs.500/-)

MIGO:-

We have done 4 GRN for one PO. For example

ME21N MIGO

5-1(20 KG)

5-2(20 KG)

5-3(20 KG)

5-4(20 KG)

5-5(20 KG)

When we have checked all the delivery charges for each grn document, we found that the system automatically bifurcates total delivery charges of Rs. 200/- into Rs. 20/- in each GRN document.

MIRO:-

1) In this level the system is not bifurcate the delivery charges at all and it showing cumulative value in the line items.

2) But for the each GRN quantity posted, can be seen in separate line item in the transaction level. For example

Existing behavior:-

Amount Quantity Reference

Rs. 200/- 20 Kg 5-1

Rs. 200/- 20 Kg 5-2

Rs. 200/- 20 Kg 5-3

Rs. 200/- 20 kg 5-4

Rs. 200/- 20 Kg 5-5

Rs. 500/- 100 kg FRC1(Condition type)

In this case the system is not bifurcating the delivery cost as per GRN wise.

Our requirement is:-

Amount Quantity Reference

Rs. 200/- 20 Kg 5-1

Rs. 200/- 20 Kg 5-2

Rs. 200/- 20 Kg 5-3

Rs. 200/- 20 kg 5-4

Rs. 200/- 20 Kg 5-5

Rs. 100 /- 20 Kg FRC1(Condition type)

Rs. 100 /- 20 Kg FRC1(Condition type)

Rs. 100 /- 20 Kg FRC1(Condition type)

Rs. 100 /- 20 Kg FRC1(Condition type)

Rs. 100 /- 20 Kg FRC1(Condition type)

Rs. 100 /- 20 Kg FRC1(Condition type)

Hence our requirement is all the planned delivery charges should be bifurcated in the transaction screen.

Conclusion:-

1) Please let me know what the configuration settings we need are.

2) If not, any suitable note available for such sceanario.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2011 at 11:32 AM

    HI,

    Check if you have checked the GR based IR in the Purchase order.By doing this you will be able to see different line items in MIRO i.e. for each GR there would be a seperate line displayed in MIRO.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.