cancel
Showing results for 
Search instead for 
Did you mean: 

Movement type in delivery and material document don't match

Former Member
0 Kudos

Hello,

We have a scenario where we are create return to vendor PO's utilizing deliveries. We have two different document types, one of which we need a custom movement type to satisfy financial requirements.

I have created a new schedule line and mapped it to the delivery type. When I create a return PO and generate an outbound delivery, the delivery shows the correct, custom, movement type. However, when I post goods issue, it utilizes the standard 161 movement type.

Looking in OMJJ at movement type 101, there is an entry under follow-on movement for function code WERE which specifies 161 should be used (if i change 161 it will post to what is specified).

This is causing our mat.doc to post with the wrong movement type. Has anyone else come across this? How can this be handled? Is is possible to specifiy a new function code within the delivery (table V_156N_VC let me create new ones tied to a movement, but I am unable to trigger their use).

Thanks,

Matt

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member131774
Contributor
0 Kudos

Return PO will use Mvt 161, this is standard process.

What do you expect?

Former Member
0 Kudos

There are a lot of SAP processes which use a specific movement in standard, but which are able to be changed to a custom movement type through this configuration.