Skip to Content
0
Former Member
Aug 24, 2011 at 07:59 AM

WAD - messages - message type

33 Views

Hi experts,

We have a planning scenario with disaggregation. In an older release there occurred an error message when something went wrong with disaggregation (disaggregation is not possible, no reference date found).

Unfortunately SAP changed with NW 7.01 SP06 the message type for this message and some other planning messages from error to information (hard-coded).

We want to have the planning messages with the message type error.

Is there a possibility to assign the message type in WAD? Or does anybody know another possibility to affect the message type in WAD?

Thanks in advance.

Best regards

Nils