Skip to Content
0
Aug 24, 2011 at 03:49 AM

How to return the components with work order?

984 Views

Dear Gurus,

I have to return some components of work order to inventory.

There are two tcodes I know I can use: MIGO / MB11

but in MIGO, I can't perform the MT262 with reference to the original work order / reservation , I must refer to material document.

and in MB11, after I post the component with MT262, the material number won't link to the original reservation.

Is there any way I can return the components with MT262 refer to work order, and the material document can link with its own reservation?

Thanks in advance...