Hi Gurus,

I have maintained inspection plan. When I check it found below error.

Char. 0020: sampling procedure SMP02 cannot be used

Message no. QP215

Diagnosis

The sampling procedure cannot be used. This may be due to one of the following reasons:

The sampling procedure:

is locked

does not fit the characteristic type

does not fit the inspection point indicator in the plan header

Procedure

Select another sampling procedure.

In sampling procedure,Sample type is 100 Fixed sample & Valuation mode is 700 Mean value within tolerence range,Control chart type is 901 Shewart chart for x-bar/n=1/Sample

Where do I wrong.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Check the header of inspection plan ...you must have used inspection points.Remove tit & try!!

or

In if you wnat to define Inspection points then sampling procedure defination QDV1/2 there is radio buttons for

inspection point.Tick it

Former Member
0 Kudos

Hi Sujit,

There is already selected radio button on sample management.

Former Member
0 Kudos

Is it means that you want to use sample management ??

.Then you have to enter sample drawing procedure in task list header.

Former Member
0 Kudos

Hi Sujit,

In inspection plan header below setting are there & I can not change it.

Inspection point is 200 Inspection point for physical sample

Sample drawing procedure is mainatined

Dynamic modification level is 3 Dynamic modification at char Level

Pls tell me where to do change so I can not face any error in inspection plan.

Former Member
0 Kudos

1.make sure that you have ticked "sample mgt" in each of the sampling procedure.

2.You have selected DMR @ char levle.Have you maintained DMR against each char/mic in inspection plan.

3.try to use CWBQM in order to change the setting at Inspection plan header.

Former Member
0 Kudos

Hi Sujit,

Thanks for your continue reply.

I have checked that it is ticked "sample mgt" in each of the sampling procedure.

Maintained DMR against each char/mic in inspection plan.

Former Member
0 Kudos

One last reply

1.If your char is quantitative type then select the valuation mode as one of the "variable " type

2.If your char is qualitative type then select the valuation mode as one of the "attribute" type

means say for 700:Valuation of mean value within tolerance limits

Valuation of a quantitative inspection characteristic according to the mean value in relation to the tolerance limits.But if you try to use this sampling procedure to a qualitative type mic then it will not work

]

anand_rao3
Active Contributor
0 Kudos

Hi Vipul,

Just check you have ticked on SPC characteristic in control indicators in inspection plan as you have mentioned you are using procedure for x bar chart.

Regards,

Anand